In April 2023, we finished the topographic survey needed for the construction of the new parking lot at the Condon High School. Our role was to collect data in the field and process the data to create the topographic map and deliver to the engineer. In 2021, the entire high school was remodeled leaving the parking lot un-finished.

Similar Posts